Operation
PRINCIPLE
Optimize production delivery by operating the assets within the risk limits at a level as low as reasonably practicable.
EXPECTATIONSALL AREAS OF THE ORGANIZATION ARE EXPECTED TO:
6.1 Carry out operations with systems, facilities, equipment and devices within the lowest possible risk limits and in accordance with applicable manuals and procedures.
6.2 Identify and analyze deviations from normal operating conditions and manage all actions required to avoid repeating them.
6.3 Define the systems, structures, equipment or devices that are critical for safety or production.
6.4 Implement alternative protection mechanisms every time protection devices or systems are deactivated or removed, either temporarily or permanently.
6.5 Implement processes for production follow-up, control and optimization.
6.6 Optimize the Production System by applying multidisciplinary processes in order to identify potential changes to be made and thus improve Performance.
6.7 Manage scheduled decommissioning and its impact, as the last stage in the life cycle of assets involved.