Elemento MGO

Design and Construction

PRINCIPLE

Apply reliable and effective technologies to the design and construction of facilities, in order to prevent incidents and achieve high standards in terms of performance, environment, integrity and operating efficiency.

EXPECTATIONS

ALL AREAS OF THE ORGANIZATION ARE EXPECTED TO:

5.1 Implement a project MS which establishes the required processes and documents, including risk management, Quality Assurance and Control, and lessons learned for future projects.

5.2 Engage staff with design, operation, maintenance, service, construction, and HSE and Asset Security competencies throughout the project.

5.3 Develop projects designed with respect for and sensitivity toward the relevant communities at all stages.

5.4 Implement processes to verify that project design complies with the Requirements and takes into consideration all operational instances and modalities, including the determination of safe operation limits.

5.5 Implement processes to verify that contracting, purchasing, construction, commissioning and start-up are conducted in accordance with the design, reducing the operational risk to the lowest level possible.

5.6 Verify that project changes are implemented only after having been approved by the relevant project managers appointed and that the reasons for change are adequately documented.

5.7 Carry out pre-implementation reviews at all new and modified facilities, as well as in those facilities previously out of order, to verify that they are safe, that staff is properly trained and that Requirements are complied with.